Friday, November 2, 2018
This week I worked more on the slave bogie. I was able to find the CAD for the slave bogie that last years team made. From this CAD model, I was able to alter it to fit the design specifications that we had imposed for this years slave bogie. This included removing the motors from the slave bogie as well as the steering. The route selection has also been removed but will be replaced later for a system that fits into the third rail. Further alterations include finding a way to bind the drive bogie and slave bogie together. There was also a presentation this week from a Futran representative that said that we much be careful of the information that we publicly disclose. He had made the assumption that everyone was under an NDA when in fact no one has been required to sign one. I foresee this to be a problem in the future.